Skip to content

Quick Update III

May 9, 2008

Couple of short updates from the Supra project:

1. The driver’s side power steering hoses are not re-installed. Liquid thread sealant compatible with oil and fuels was used on all thread joints of the new couplers. Hopefully there will be no leaks.

2. The passenger side hose will have to be shortened and more than likely have both ends changed to 90 degree ends, especially the one closest to the exhaust manifold to avoid the hose coming into contact with it.

3. Engine is centered within 1/16″ left to right within the engine bay. I just need to shim it now to get it level left to right. I should be doing this tomorrow morning, then I can start taking measurements to use to fabricate the motor mounts. Going to be a tight squeeze!

From → Supra

Comments are closed.

%d bloggers like this: